Working with a truck crane or excavator...
Poster
- Identifier
- JS1482
- Category
- P.5. Social posters
- Subject
- P.5.1. Health promotion
- Shelve
- D.7.
- Title
-
en
Working with a truck crane or excavator...
AI (Unreviewed)
Provenance Translated by mistral-large-latest on 23.04.2026 - Strādājot ar autoceltni vai ekskavatoru...
- Year
- 1963
- Author
- unknown
- Publisher
- Galvenā enerģētikas un ekeltrifikācijas pārvalde
- Place
- unknown
- Method
- unknown
- Dimensions
- 70 x 31 cm
- Preservation
- 10
- Count
- 1
- Language
-
Latvian
AI (Unreviewed)
Provenance Generated by mistral-large-latest on 23.07.2026
The poster is divided into two main parts with contrasting colors. The upper part has a light blue background, on which a high-voltage power transmission tower and a construction crane with a raised boom are depicted. The lower part features a dark yellow stripe, where text is visible. On the right side, an older model cargo truck with a platform is shown, on which two people stand, one of them working on the power transmission line. In the center of the poster, an orange arrow stands out, pointing from the text to the image. In the upper left corner, there is an orange rectangle with text. The font is simple, with thick lines, ensuring good readability. The images are stylized, with pronounced outlines and minimal details.
AI (Unreviewed)
Provenance Generated by mistral-large-latest on 22.07.2026; Translated by mistral-large-latest on 22.07.2026
ATTĀLUMAM STARP STRĒLI VAI KRAVU
UN TUVĀKO GAISA VADU LĪNIJAS VADU
HORIZONTĀLĀ VIRZIENĀ JĀBŪT NE MAZĀK PAR:
1,5 M PIE SPRIEGUMA LĪDZ 1,000 VOLTIEM
2,0 M PIE SPRIEGUMA LĪDZ 20,000 VOLTIEM
4,0 M PIE SPRIEGUMA NO 35,000-110,000 VOLTIEM
STRĀDĀJOT AR AUTOCELTNI VAI
LĪNIJU TUVUMĀ, JĀIEVĒRO
EKSKAVATORU ELEKTROPĀRVADES
SEVIŠKA PIESARDZĪBA!
VĒSĒPĪST [?]
UN TUVĀKO GAISA VADU LĪNIJAS VADU
HORIZONTĀLĀ VIRZIENĀ JĀBŪT NE MAZĀK PAR:
1,5 M PIE SPRIEGUMA LĪDZ 1,000 VOLTIEM
2,0 M PIE SPRIEGUMA LĪDZ 20,000 VOLTIEM
4,0 M PIE SPRIEGUMA NO 35,000-110,000 VOLTIEM
STRĀDĀJOT AR AUTOCELTNI VAI
LĪNIJU TUVUMĀ, JĀIEVĒRO
EKSKAVATORU ELEKTROPĀRVADES
SEVIŠKA PIESARDZĪBA!
VĒSĒPĪST [?]
AI (Unreviewed)
Provenance Generated by mistral-ocr-latest on 23.07.2026
DISTANCE BETWEEN THE BOOM OR LOAD
AND THE NEAREST OVERHEAD POWER LINE CONDUCTOR
IN THE HORIZONTAL DIRECTION MUST BE NO LESS THAN:
1.5 M FOR VOLTAGE UP TO 1,000 VOLTS
2.0 M FOR VOLTAGE UP TO 20,000 VOLTS
4.0 M FOR VOLTAGE FROM 35,000 TO 110,000 VOLTS
WHEN WORKING WITH A VEHICLE-MOUNTED CRANE OR
NEAR POWER LINES, OBSERVE
EXCAVATOR ELECTRICAL TRANSMISSION
SAFETY PRECAUTIONS!
CAUTION [?]
AND THE NEAREST OVERHEAD POWER LINE CONDUCTOR
IN THE HORIZONTAL DIRECTION MUST BE NO LESS THAN:
1.5 M FOR VOLTAGE UP TO 1,000 VOLTS
2.0 M FOR VOLTAGE UP TO 20,000 VOLTS
4.0 M FOR VOLTAGE FROM 35,000 TO 110,000 VOLTS
WHEN WORKING WITH A VEHICLE-MOUNTED CRANE OR
NEAR POWER LINES, OBSERVE
EXCAVATOR ELECTRICAL TRANSMISSION
SAFETY PRECAUTIONS!
CAUTION [?]